MX-OptiPlan is the smart visual planning cockpit natively integrated with IBM Maximo. Synchronise your workforce, anticipate conflicts, align planned vs actual — no parallel data layer, no spreadsheets.
As operations scale, the bottleneck is no longer data availability — it's coordination, visibility and alignment at execution.
Scheduling still relies on Excel files, manual transfers and fragmented views of work orders, crews and priorities.
Without real-time synchronisation, schedules drift from field reality and trigger costly reactive rescheduling.
Absences, skill conflicts and overloads remain hidden until they disrupt field execution.
Decision-makers lack visibility into the gap between what is planned and what is actually executed — making any improvement hard to measure.
Synchronise, visualise and optimise your scheduling in the environment your teams already use — no parallel data layer, no disconnected tool.
Instantly consolidate work orders, labour and constraints into a unified planning view, loaded automatically from Maximo. No manual input, no parallel layer to maintain.
Turn Maximo data into actionable planning views across all time horizons: day, week, month. Less time navigating data, more time deciding.
Resolve conflicts, rebalance capacity and improve execution performance through real-time planned vs. actual feedback.
Not just speed — an architecture aligned with Maximo data, execution and governance.
Operate directly on trusted Maximo data — no duplicated planning layer to govern, no synchronisation to maintain.
The planning cockpit is always current thanks to automatic loading on login and targeted on-demand refresh.
Plan continuously across the day, week and month in one environment — no model break, no loss of continuity.
Compare planned vs. actual to strengthen feedback loops and improve execution discipline over time.
A consistent answer for operations, planning and field teams — without multiplying tools, interfaces or duplicating data.
Improve plan reliability, resource utilisation and execution discipline — without adding a new planning silo to manage.
Build better plans faster, with full visibility over workforce, assignments and constraints — and reduce Excel dependency.
Execute daily and weekly plans in a clear visual environment designed for the way maintenance teams actually think.
A structured pilot, measured on concrete criteria — to move from demonstration to deployment decision.
Time between login and producing an optimised first schedule ready to share with teams.
Number of conflicts, overloads and inconsistencies identified and resolved before field execution.
Manual coordination effort avoided compared to the previous spreadsheet mode, measured over the pilot period.
Gap between planned work and actual field execution during the pilot period — measured against Maximo data.
Ease of use for planners in recurring scenarios — measured on concrete cases, not in theory.
Time required to reschedule after a field change, an unexpected event or a priority reallocation.
A clear path from installation to real operational planning scenarios, guided by our IBM Maximo consultants.
Setting up the MX-OptiPlan component in the Maximo environment, aligning functional scope, sites and access rules with your IT team.
Configuring the cockpit for work orders, labour, crews, assignments and constraints — in collaboration with your planners.
Running a first daily or weekly scenario, measured against concrete criteria, with operational feedback and a continuous improvement loop.
No generic assumptions. The business case is built on a measured pilot, with real data from your Maximo environment.
Five operational levers identified and activated from the pilot phase, aligned with your maintenance objectives.
Five concrete measurements to move from a demonstration to a data-backed deployment decision.
A short demonstration to prove the workflow, followed by a pilot measured on a planning use case relevant to your operations. A Sinorfi consultant guides you through.